Incident Response · Topic 4 of 4

BCP, DRP, BC/DR Standards and Crisis Management

Learn how a business continuity plan differs from a disaster recovery plan, key BC/DR standards such as ISO 22301 and NIST SP 800-34, and crisis handling.

  • 4 min
In a nutshell
  • BCP covers the whole business, DRP covers IT recovery.
  • ISO 22301 is the BCMS standard, and NIST SP 800-34 is the contingency planning guide.
  • The BIA drives both plans.

What it is

A business continuity plan (BCP) describes how the whole organization keeps critical functions running during a disruption. A disaster recovery plan (DRP) describes how IT systems, data and facilities are restored.

Crisis management (CM) is the leadership and communication effort that handles a serious event as it unfolds. Standards give a common structure for all three.

DisruptionCrisis managementdecide and communicateBCPkeep functions runningDRPrestore ITReturn to normal

How it works

Business Continuity Plan (BCP) and Disaster Recovery Plan (DRP)

AspectBCPDRP
ScopeWhole business: people, processes, sites, suppliersIT systems, networks and data
GoalKeep critical functions runningRestore technology to a working state
Driven byBusiness impact analysisRTO and RPO from the BIA
Typical contentRoles, alternate work sites, manual workarounds, supplier and customer communicationRecovery steps per system, backup locations, failover, contact lists
OwnerBusiness leadershipIT leadership

A good BCP includes:

  • Purpose, scope and the approval of senior management
  • Critical functions and their recovery priorities
  • Team roles and a call tree
  • Alternate locations and work arrangements
  • Communication plans for staff, customers, regulators and media
  • Supplier dependencies
  • Testing and maintenance schedule

A good DRP includes the asset list, recovery order, backup and restore procedures, alternate site details, vendor contacts and the step by step recovery runbooks.

Plans are tested in increasing depth.

TestWhat it involves
Read through (checklist)Owners review the plan for gaps
Tabletop exerciseThe team talks through a scenario in a meeting
Walkthrough or simulationRoles act out the steps without changing live systems
Parallel testRecovery systems are brought up while production keeps running
Full interruptionProduction is switched to the recovery site. Highest risk and highest proof

Plans must be reviewed after every test, incident or major change.

BC/DR standards

StandardWhat it provides
ISO 22301Requirements for a business continuity management system (BCMS). Can be certified
ISO 22313Guidance on using ISO 22301
ISO/IEC 27031Guidelines for information and communication technology readiness for business continuity
ISO/IEC 27001Information security management system, which includes information security continuity controls
NIST SP 800-34Contingency Planning Guide for Federal Information Systems
NFPA 1600Standard for disaster, emergency management and business continuity

The older British standard BS 25999 was replaced by ISO 22301.

NIST SP 800-34 outlines seven steps of contingency planning:

  1. Develop the contingency planning policy
  2. Conduct the business impact analysis
  3. Identify preventive controls
  4. Create contingency strategies
  5. Develop the information system contingency plan
  6. Ensure plan testing, training and exercises
  7. Ensure plan maintenance
PolicyBIAPreventive controlsStrategiesPlanTest and trainMaintain

Crisis Management (CM)

A crisis is a serious event that threatens the organization's reputation, people or survival, and goes beyond a normal incident. A large data breach, a fire or a ransomware outage that stops operations can become a crisis.

ElementPurpose
Crisis management teamSenior leaders with authority to decide quickly
Crisis planDefined roles, triggers and decision paths
CommunicationOne accurate voice to staff, customers, regulators and media
Command centerA place or channel where the team coordinates
Link to BCP and DRPThe crisis team activates and oversees these plans

Crisis management moves through stages: preparedness before, response during, recovery after, and review to learn. Fast, honest and consistent communication protects trust. Incident response handles the technical event, and crisis management handles the organization wide consequences.

A worked example

A ransomware attack takes down order processing across the company. The incident response team contains the malware. The crisis management team, led by executives, decides to activate the BCP, so staff take orders by phone using a manual process. The IT team runs the DRP to restore systems from offline backups in the agreed order.

The communications lead briefs customers and the regulator with one consistent message. After recovery, the company reviews the lessons and updates all three plans.

How the exam asks about this

  • "Which plan focuses on restoring IT systems and data after a disaster?" → The disaster recovery plan.
  • "Which ISO standard specifies a business continuity management system?" → ISO 22301.
  • "Which test has the team discuss a scenario without touching systems?" → A tabletop exercise.

What to remember for the exam

  • BCP covers the whole business, DRP covers IT recovery.
  • ISO 22301 is the BCMS standard, and NIST SP 800-34 is the contingency planning guide.
  • The BIA drives both plans.
  • Tests range from read through and tabletop to parallel and full interruption.
  • Crisis management provides leadership and communication above the technical response.
Watch out

A full interruption test can cause a real outage. Run it only after lighter tests succeed and with management approval.

Common mistakes

Treating the BCP and DRP as one document. They have different scope and owners and must be consistent.

Writing a plan and never testing it. Plans decay as systems change.

Leaving communication out. Silence or mixed messages during a crisis do more damage than the outage.

Check yourself

  • What is the main difference between a BCP and a DRP?

    A BCP keeps the whole business functioning, while a DRP restores IT systems and data.

  • Which standard replaced BS 25999?

    ISO 22301.

  • What does a tabletop exercise test?

    Whether people understand their roles and the plan, through a talked-through scenario without changing live systems.

Topic 4 of 4 in Incident Response

Test yourself on Incident Response

The full EC-Council 312-38 question bank has 800 questions, with timed practice exams and an explanation for every answer.

This study guide is independent and is not affiliated with, endorsed by, or sponsored by EC-Council. Vendor names, certification names and exam codes are trademarks of their respective owners and are used for identification only.